NAGR1

NAGR1

产品编号 :
英文名称 :
中文名称 :
品牌 :
包装规格 交货周期 质量标准 目录价 会员专享价 数量
1.0mg/ml 现货2-3天 原装正品
- +
基础信息
存储条件
产品详情
Product Profile
Product NameNAGR1
Antibody TypePrimary Antibodies
Antigen AliasCEAR; HNRPM; HTGR1; NAGR1; HNRPM4; HNRNPM4; hnRNP M
ImmunogenPurified recombinant fragment of human NAGR1 (AA: 17-161) expressed in E. Coli.
Key Feature
ClonalityMonoclonal
IsotypeUnknown
Host SpeciesUnknow
Tested ApplicationsWBIHCICCFCMICC/IF

WB:1:250~1:1000
IHC:1:20~1:100
ICC:1:100~1:200
ICC/IF:1:100~1:200
Notes:Optimal dilutions/concentrations should be determined by the researcher.
Species ReactivityHumanMouseRat
PurificationUnpurified
Target Information
Alternative NamesCEAR
HNRPM
HTGR1
NAGR1
HNRPM4
HNRNPM4
hnRNP M
Molecular Weight(MW)77.5kDa
Database Links
Entrez Gene4670
Application

Application

Figure 1:Black line: Control Antigen (100 ng);Purple line: Antigen (10ng); Blue line: Antigen (50 ng); Red line:Antigen (100 ng)

Application

Figure 2:Western blot analysis using NAGR1 mAb against human NAGR1 (AA: 17-161) recombinant protein. (Expected MW is 42.2 kDa)

Application

Figure 3:Western blot analysis using NAGR1 mAb against HEK293 (1) and NAGR1 (AA: 17-161)-hIgGFc transfected HEK293 (2) cell lysate.

Application

Figure 4:Western blot analysis using NAGR1 mouse mAb against Raji (1), Hela (2), NIH/3T3 (3), A431 (4), A549 (5), HepG2 (6), PC-12 (7), and U251 (8) cell lysate.

Application

Figure 5:Immunofluorescence analysis of Hela cells using NAGR1 mouse mAb (green). Blue: DRAQ5 fluorescent DNA dye.

Application

Figure 6:Immunofluorescence analysis of Hela cells using NAGR1 mouse mAb (green). Blue: DRAQ5 fluorescent DNA dye. Red: Actin filaments have been labeled with Alexa Fluor- 555 phalloidin. Secondary antibody from Fisher (Cat#: 35503)

Application

Figure 7:Flow cytometric analysis of HL-60 cells using NAGR1 mouse mAb (green) and negative control (red).

Application

Figure 8:Immunohistochemical analysis of paraffin-embedded esophageal cancer tissues using NAGR1 mouse mAb with DAB staining.

Application

Figure 9:Immunohistochemical analysis of paraffin-embedded rectum cancer tissues using NAGR1 mouse mAb with DAB staining.
Application NotesWB:1:250~1:1000
IHC:1:20~1:100
ICC:1:100~1:200
ICC/IF:1:100~1:200
Notes:Optimal dilutions/concentrations should be determined by the researcher.
Additional Information
FormPurified antibody in PBS with 0.05% sodium azide
Storage Instructions4℃; -20℃ for long term storage


相关文献

抱歉,暂无相关文献